PROJECT DESCRIPTION
Removal of existing parking lot in areas on eastern section of property with installation of 8” concrete paver subgrade and installation of parking lot pavers for approximately 80 parking spaces with fire lane areas and adjacent sidewalks
PROJECT DESCRIPTION
New subdivision in East Dallas, including site work to build and bench lots and road excavation. Installation of environmental rain garden and approaches, ADA ramps and R.O.W. sidewalks.
PROJECT DESCRIPTION
New terminal building and parking lot areas, including all site work with lime stabilization subgrade for paving. Site work included moisture conditioning for foundation areas, removal of Industrial Road and section of existing parking lot. Terminal Building- Install new 20,000 square foot foundation for terminal building including piers, beams and slab. Terminal building paving- Installation of 45,000 square foot parking lot.
PROJECT DESCRIPTION
Excavation and concrete work to build subdivision on West Davis Street, Dallas, Texas. Work included the export of 350 trailer loads of rock and import of 500 trailer loads of select fill materials to build and bench building lots. New road paving and approaches, with 311T City of Dallas Public Works construction.
PROJECT DESCRIPTION
Demolition work for existing site, Site work and concrete construction for a new Autism residential center in Cross roads, Texas. Work including site excavation for approximately 25 acres, with post tension foundation construction for 8 new multi-family homes and duplexes, new road construction and parking lot. In addition a community center foundation and approximately 9,000 square feet of colored and stamped concrete
PROJECT DESCRIPTION
Site work and concrete construction for new school construction. Site work included removal of 30,000 square feet of paving, 14,000 square feet of moisture conditioning to a depth of 8’, site preparation for paving. Foundation included a 12,000 square foot foundation with elevator shaft. Paving included parking lot, sidewalks and approaches. 311T constriction including ADA ramps, approaches and Right of Way (R.O.W.) walks.
PROJECT DESCRIPTION
Construction of a new 54,000 square foot hangar, with a 48,000 square foot apron and 78,000 square feet of paving
PROJECT DESCRIPTION
Concrete paving for newly renovated shopping center, including sidewalks and approaches
PROJECT DESCRIPTION
New construction of road construction for North Gate Entrance. Work included site work, lime stabilization subgrade, curb inlet and storm drain installation and concrete paving for extension to Wintergreen Road in Hutchins, Texas.
PROJECT DESCRIPTION
New road construction to connect Cedar Springs with Nash Street in Dallas, Texas. Work included 311T City of Dallas Public Works construction
PROJECT DESCRIPTION
New post tension foundation with piers- 14,000 square foot foundation, with retaining wall construction in Dallas, Texas
PROJECT DESCRIPTION
Demo for renovation of new nightclub in Dallas, Texas. Work included saw cut and demolition of interior floor for plumbers and demolition of interior flooring. Installation of new entrance including salt finished concrete and pavers.