Projects

Project Archive Archive

20 24 24

Hamilton Form

PROJECT DESCRIPTION

88,000 SF flex base parking lot at 6-12” depth with geotextile and site grading.

Richardson Animal Shelter

PROJECT DESCRIPTION

City of Richardson project. Demolition and site grading. Construction of structural slab addition and structural ADA ramp feature

Walnut Creek Library

PROJECT DESCRIPTION

City of Garland project. Ground up construction to include site clearing and demo. Import common fill and moisture conditioning onsite soils. Large beam and structural foundation installation. Site paving including fire lane and parking

Red Door Townhomes

PROJECT DESCRIPTION

Site grading and road paving for townhome project.

Mrs. Baird’s

PROJECT DESCRIPTION

Site demo and excavation. 311T approach installation City of Dallas. Interior new parking lot and slab addition.

20 23 23

Staffzone Plano

PROJECT DESCRIPTION

Site grading including existing demolition. Foundation for new building including 6’ moisture conditioning. Site paving fire lane and parking.

Ruby Subdivision

PROJECT DESCRIPTION

Site grading and new alley construction.

Denton Fleet Services

PROJECT DESCRIPTION

Demolition and renovation/addition to City of Denton fleet services building. Site paving for heavy duty traffic. Tilt wall construction for building addition.

Biolife Mesquite

PROJECT DESCRIPTION

Ground up construction. Clear and grub heavily wooded site. Cut to fill and site excavation. Structural slab foundation installation. Site paving.

Kessler West Phase 3

PROJECT DESCRIPTION

Retaining wall approximately 20’Hx300’L with footer and backfill. Final site grading and foundation for 10-unit townhome.

Terminal at Katy Trail

PROJECT DESCRIPTION

Exterior paving improvements for high end new construction apartments including a water feature and elevated park area on geofoam subgrade. Retaining walls and specialty stamped and colored concrete.

20 22 22

Lhoist North America

PROJECT DESCRIPTION

Site demo and grading. New slakers, pigs, silo foundations. New site paving for tractor trailer traffic

McKinney Ranch Parkway

PROJECT DESCRIPTION

Retail shopping center. Scope included removal of large stockpile onsite soil. Demo and site excavation. Moisture conditioning and foundation for shopping center. Site paving fire lanes and parking spaces as well as sidewalk.

Mary Will Craig Park

PROJECT DESCRIPTION

City of McKinney project. Park renovation overhaul. Demo of existing drainage system and sidewalks. A new skate park and baseball field as well as new installation of sidewalks and drainage.

Gotham Greens

PROJECT DESCRIPTION

ARCO/Murray project entailing mass excavation of 30-acre site. Moisture conditioning 15’ for 100,000 SF building. Temporary access roads and lay down yards. Lime stabilization for fire lane and heavyduty paving. Two-acre detention pond and site drainage

20 21 21

Finch Park

PROJECT DESCRIPTION

Full municipal park renovation including new splash pad, sidewalks, retaining walls, walkways, and road repair.

Highland Park Village Phase 4

PROJECT DESCRIPTION

Demo existing sidewalk and roadways. Highly coordinated with operating store tenants and shopping center administration. Form and pour paver base and curb & gutter. Place sand bedding and clay sidewalk/road pavers.

Bennett Town Homes

PROJECT DESCRIPTION

Site grading, foundations, and paving for high end townhome project.

29 Acres Phase 2

PROJECT DESCRIPTION

Demolition and site excavation, post tension foundation, new road construction and parking lot.

20 20 20

Fortiline Waterworks

PROJECT DESCRIPTION

Material yard renovation. Demo of existing gravel lay down yard. Regrade yard with coordination for operating business. Form, pour, and finish laydown yard with 7” paving

Cathedral of Hope Church

PROJECT DESCRIPTION

Parking lot improvement. Demo of existing asphalt parking lot. Form and pour paver base and curb and gutter. Place bedding sand and new clay pavers.

Kessler West Phase 2

PROJECT DESCRIPTION

Site grading and new roads for $1mm per unit townhome project. Slip form paved roads, curb and gutter.

Highland Park Village Phase 3

PROJECT DESCRIPTION

Demo existing sidewalk and roadways. Highly coordinated with operating store tenants and shopping center administration. Form and pour paver base and curb & gutter. Place sand bedding and clay sidewalk/road pavers.

20 19 19

HIGHLAND PARK VILLAGE – HIGHLAND PARK, TEXAS

PROJECT DESCRIPTION

Removal of existing parking lot in areas on eastern section of property with installation of 8” concrete paver subgrade and installation of parking lot pavers for approximately 80 parking spaces with fire lane areas and adjacent sidewalks.

ABODE AT WHITE ROCK, WHITE ROCK LAKE

PROJECT DESCRIPTION

New subdivision in East Dallas, including site work to build and bench lots and road excavation. Installation of environmental rain garden and approaches, ADA ramps and R.O.W. sidewalks.

MCKINNEY NATIONAL AIRPORT, MCKINNEY, TEXAS

PROJECT DESCRIPTION

New terminal building and parking lot areas, including all site work with lime stabilization subgrade for paving. Site work included moisture conditioning for foundation areas, removal of Industrial Road and section of existing parking lot. Terminal Building- Install new 20,000 square foot foundation for terminal building including piers, beams and slab. Terminal building paving- Installation of 45,000 square foot parking lot.

KESSLER WEST- DALLAS, TEXAS (SUBDIVISION)

PROJECT DESCRIPTION

Excavation and concrete work to build subdivision on West Davis Street, Dallas, Texas. Work included the export of 350 trailer loads of rock and import of 500 trailer loads of select fill materials to build and bench building lots. New road paving and approaches, with 311T City of Dallas Public Works construction.

29 ACRES – HOUSING COMMUNITY FOR ADULTS WITH AUTISM

PROJECT DESCRIPTION

Demolition work for existing site, Site work and concrete construction for a new Autism residential center in Cross roads, Texas. Work including site excavation for approximately 25 acres, with post tension foundation construction for 8 new multi-family homes and duplexes, new road construction and parking lot. In addition a community center foundation and approximately 9,000 square feet of colored and stamped concrete.

SPANISH HOUSE SCHOOL – DALLAS, TEXAS

PROJECT DESCRIPTION

Site work and concrete construction for new school construction. Site work included removal of 30,000 square feet of paving, 14,000 square feet of moisture conditioning to a depth of 8’, site preparation for paving. Foundation included a 12,000 square foot foundation with elevator shaft. Paving included parking lot, sidewalks and approaches. 311T constriction including ADA ramps, approaches and Right of Way (R.O.W.) walks.

20 18 18

MCKINNEY TRANSIENT HANGAR MCKINNEY NATIONAL AIRPORT

PROJECT DESCRIPTION

Construction of a new 54,000 square foot hangar, with a 48,000 square foot apron and 78,000 square feet of paving.

CORINTH DESOTO SHOPPING CENTER, CORINTH

PROJECT DESCRIPTION

Concrete paving for newly renovated shopping center, including sidewalks and approaches.

UNION PACIFIC RAILWAY COMPANY, HUTCHINS

PROJECT DESCRIPTION

New construction of road construction for North Gate Entrance. Work included site work, lime stabilization subgrade, curb inlet and storm drain installation and concrete paving for extension to Wintergreen Road in Hutchins, Texas.

CATHEDRAL OF HOPE CHURCH, NORTH DALLAS

PROJECT DESCRIPTION

New road construction to connect Cedar Springs with Nash Street in Dallas, Texas. Work included 311T City of Dallas Public Works construction.

RADBROOK RESIDENTIAL FOUNDATION, NORTH DALLAS

PROJECT DESCRIPTION

New post tension foundation with piers- 14,000 square foot foundation, with retaining wall construction in Dallas, Texas.

ONE SETTE DALLAS NIGHTCLUB, UPTOWN

PROJECT DESCRIPTION

Demo for renovation of new nightclub in Dallas, Texas. Work included saw cut and demolition of interior floor for plumbers and demolition of interior flooring. Installation of new entrance including salt finished concrete and pavers.

20 17 17

HP VILLAGE 1 MOCKINGBIRD LANE, DALLAS

PROJECT DESCRIPTION

Demo & replace sidewalk. Pour concrete base, curb, gutter. Install brick pavers with paver base. Mill and pour back asphalt paving.

KIA OF PLANO CORNER OS RUSSEAU AND PREMIER DR

PROJECT DESCRIPTION

Parking lot, wet utilities, city approach, city sidewalk.

TEXON OFFICE PARK 2421 WELWOOD DR, CARROLTON

PROJECT DESCRIPTION

New construction. Excavation, foundation, parking lot, curb and gutter.

MKT PLACE STORAGE 8770 STACY RD, FRISCO

PROJECT DESCRIPTION

New construction. 5 acre site, excavation, foundation, roads, curb & gutter, brick pavers, city approach.

FERRIS WHEELER'S 1950 MARKET CENTER BLVD, DALLAS

PROJECT DESCRIPTION

Foundation, retaining walls, brick pavers, crushed granite courtyard.

ALA LIGHTING 101 TURTLE CREEK BLVD, DALLAS

PROJECT DESCRIPTION

Parking lot, curb & gutter, city approach, sidewalk.

20 16 16

HP VILLAGE 47 HIGHLAND PARK VILLAGE, DALLAS

PROJECT DESCRIPTION

Demo & replace sidewalk. Pour concrete base, curb, gutter. Install brick pavers with paver base. Mill and pour back asphalt paving.

KESSLER RESERVE KESSLER RESSERVE CT, DALLAS

PROJECT DESCRIPTION

New construction. Excavation, road construction, roll down curb &gutter, city approach.

PSW KINGS HWY 1600 KINGS HIGHWAY, DALLAS

PROJECT DESCRIPTION

New construction, Site work/excavation, road construction, curb & gutter, city approach, city sidewalk.

FOUNTAIN PLACE 1445 ROSS AVE, DALLAS

PROJECT DESCRIPTION

Demo & replace City road crosswalks, pour back concrete base, install road brick pavers, repair road asphalt, demo and replace city sidewalk and curb & gutter, ADA compliant barrier free ramp install.

KLC CHURCH 12330 ROLATER RD, FRISCO

PROJECT DESCRIPTION

New construction. Site work/excavation, foundation, road construction, curb & gutter, storm inlet, fire lane, city approach.

SPANISH HOUSE 7159 E GARLAND AVE, DALLAS

PROJECT DESCRIPTION

New Construction. Site work/excavation, foundation, elevator shaft base, parking lot, curb & gutter, city approach, city sidewalk.